Quote (iiTzChunky @ Aug 1 2016 12:16pm)
Build box to desired hight, then measure distance from bottom of tub to top of box, put 2x4s standing vertically to support tub and put wood into 2x4s
Ezpz
Dont over think this.
You're putting to much work into this simple task.
I'd be able to get that panel off in under 20 minutes, and so could the op if he owned or borrowed a grinder. I'm also visualizing construction of this with my dog in mind. He's 120 lbs and would shake this thing lose in an instant without proper bracing if he had a mind to.
/E
That all being said I would build this about 6 inches off the ground to allow for a piece of PVC to a drain. Sounded to me like the op wanted a station he could stand at though.
This post was edited by Spruce on Aug 1 2016 11:32am