Quote (hard_hitter_86 @ Feb 1 2014 12:55am)
i did itfor a few months when i was remodeling a CEO's office back in like 2007?ish. we snipped the sides and scored it with a blade and bent it over andbroke them
oh wow you did it oldschool as fuck eh no wonder it took u so long

im usually the one cutting them and if im using the chopsaw i rig up a thing to just lean them against it chop n carry them over ... cut 2 at a time in like 10 secs
when were snip cutting them toh tis slow as fuck lol and i hate it cuz my wrist is fucked up after cutting like 3 its toast
i usualy work with another person or 2 too so it works out 1 lays it out shoots the track in i cut other guys throwin up the walls or i put the studs in after cutting like 20 then when its laid out i cut n other guy throwsem in
having a routine helps a lot too we were doing it p[retty steady for a bit we turned a big ass 3 floor building into an appartment building haha after that shits quicktime normally we just do a wall or 2 drywall or grid ceiling
we do cove now too we found a guy that makes like styrofoam pre coated pre molded cove we just put it up and do touch ups here and there he goes around measures all the corners and shit and makes each specific so even out of swuare houses arent so bad like the old cove lol