Quote (Textbook @ Mon, Feb 16 2009, 12:09pm)
Help me with math
took me 7min to wc 28
how long it take me to cut 1k ?
7 minutes? Ouch.
That's even slower than my estimate. I was giving you 300 an hour.
1k /28 = 35.7 loads.
35.7 loads = 249.9 minutes, or 4 hours, 9 minutes.
At that rate, It'll take you 12,495 minutes, or 208 hours, 15 minutes to cut them all.
e: 208 hours /14 days = 14.85 hours a day to cut 50k
30k = 249.9 x 30 = 7497 = 124.95 hours /14 days = 8.925 hours each day.
This post was edited by sardoniclysane on Feb 16 2009 11:13am